Water Pollution Control
Control of water pollution requires appropriate infrastructure and management plans as well as legislation.
Air Pollution Control
Air quality is closely related to the earth's climate and ecosystems globally.
Environmental Remediation
Environmental remediation deals with the removal of pollution or contaminants from environmental media such as soil, groundwater, sediment, or surface water.
25
Disciplines
15
Countries
60
Clients
03
Ecological Lab.
We partner with our clients to create sustainable value by:
• Achieving and demonstrating compliance with laws and regulations
• Managing environmental, health, safety and social responsibility challenges
• Increasing profits through responsible waste management, energy conservation and improved operations efficiency
• Saving cost through utilization of cleaner energy sources
• Achieving overall positive impact on the environment and society

Environmental Impact Assessment
The main EIA techniques used in scoping are baseline studies, checklists, matrices and network diagrams. These techniques collect and present knowledge and information in a straightforward way so that logical decisions can be made about which impacts are most significant

Ecosystem Restoration
Ecosystem restoration by assisting in the recovery of ecosystems that have been degraded or destroyed, as well as conserving the ecosystems that are still intact. Create the conditions needed for recovery so the plants, animals, and microorganisms can carry out the work of recovery themselves.






Find Your Potential Solution for Environmental Problem
Find Your Potential Solution for Environmental Problem
- (ESIA) Studies
- Action Plans (IFC)
- Social Management
- Sites Characterization
- Waste Management (Waste-to-Energy)
- Environmental Remediation
- Pollution Control
Modelling
- Air dispersion modelling from single and multiple sources
- Microclimate modelling (air, wind speed and temperature modelling) for urban designs optimization
- Heat waste modelling (stack flair modelling).
Climate Change Risk Assessment
evaluation of green gases (GHG) evolving from any project stages to control the project emissions and prepare corrective action plan (if needed). The plan usually props the actions to be taken in case the expected emissions exceed the benchmark values for the particular industry.
Engineering Key Expertise
- Professional engineering discipline with particular emphasis on Water & Wastewater Treatment and Pumping Systems.
- Promoting and maintaining the technical adequacy, uniformity, and equality of the project designs in the primary areas of Process, Hydraulics and Dynamic Simulation
- Risk Assessment (Qualitative & & Quantitative)
- Value Engineering
- HAZOP Studies
- CFD Modelling.
- Research and Development Studies, Theses
- Environmental Control, Laboratories Analysis
- Pilot Plants, Existing Plants Retrofitting (Process Evaluation)
- Physical Modelling for Hydraulic Structures & Intakes
- Institutional, Social, Economic and Feasibility Studies




Environmental Engineering Consultancy Services Alliance
in The Kingdom of Saudi Arabia
More than environmental solutions
Egypt & Saudi Arabia Engineering Expertise 25 Years (1999 – 2023) - Samples
Egypt & Saudi Arabia Engineering Expertise 25 Years (1999 – 2023) - Samples
R & D Projects
R & D Projects

Project: R&D BNR Process System 1,000 CMD
Task: R&D in BNR
Location: Riyadh, Saudi Arabia Year: 2005
Client: King Abdul Aziz City for Science & Technology– KACST

Project: Riyadh Sewage Treatment Plant Task:
Aeration System Retrofitting - Oxic / Anoxic Zones - Oxygen Release Denitrification Process
Year: 2005 Location: Riyadh, Saudi Arabia
Client: Riyadh General Water Directorate .


Process Simulation - Modelling
ICEAS 120,000 CMD
Process Simulation - Modelling
ICEAS 120,000 CMD

Project: Water Pollution Control for Qarun Lake
Task: Process Systems
Location: Fayoum, Egypt,
Year: 2020
Client: FWWC, Fayoum, Egypt
Construction: Funded by EBRD (400 million Euro).
Objective: The project aims to reduce the pollution in Lake Qarun due to the direct discharge of raw domestic wastewater into drains, where the lake is now used as a general reservoir for agricultural drainage, treated wastewater, and untreated sewage water from the unserved areas of Fayoum. The agriculture drainage with the wastewater discharge into the lake through two drains, ElWadi & ElBats.

Project: King Abdel Aziz Endowment Project
Task: Grey WTP - Towers A-B (1600 & 220 CMD)
Location: Makkah, Saudi Arabia
Year: 2005
Client: SBG Group, Jeddah, Saudi Arabia

Project: ALKhumrah Industrial TP 50,000 CMD
Task: Engineering Design (Process & Hydraulic)
Year: 2009
Location: Jeddah, Saudi Arabia
Client: SuidoKiko Middle East, Jeddah, KSA

Project: Dammam Technical Industrial Zone Development Task: Proposal for Master Plan Year: 2005 Location: Dammam, Saudi Arabia Client: Saudi Organization for Industrial Estates & Technical Zones (SOIETZ) |

West Makkah (Hadda) MLS (250,000 m3/d)
Location: Jeddah, Saudi Arabia
Client: Makkah Al-Mukaramah Water Directorate


Project: Hail Sewage Treatment Plant (150,000 m3/day) Year: 2010
Task: Process & Hydraulic Design Client: CWC Location: Hai'l - KSA

Project: Dirab Pumping Station (75,000 m3/day) Year : 2022
Task: CFD Modelling for Wet-Well Capacity & Influence Pumping Suction
Client: NWC - Saudi Arabia